5. IMPLEMENTATION PROGRAM


The purpose of this chapter is to summarize an implementation program for the fifteen-year planning period, 1986 through 2000.

5.1 IMPLEMENTATION MECHANISMS
This section briefly outlines the major mechanisms for implementation of the Comprehensive Campus Plan for the planning period.

5.2 PHYSICAL DEVELOPMENT PROGRAM
In order to develop a phased implementation program, a summary of proposed buildings and facilities has been prepared as outlined in Table A. Based on information available at this time, sizing in gross square feet, and construction starts and completions are assumed. In addition, some existing buildings are planned for renovation. The phasing utilized is as follows:
Phase 1 5-Year Period 1986 through 1990
Phase 2 10-Year Period 1991 through 1995
Phase 3 15-Year Period 1996 through 2000

The proposed buildings and facilities have been assigned a site as shown in Figure M. In many cases, alternative sites should be considered during the Facility Site Analysis.

Based on the facilities, sizing, locations, and phasing assumed above, other needed improvements can be identified. These include major open space development/redevelopment, permanent parking lots and structures, and street closures and improvements. It should be noted that part of the parking needs are proposed to be met through designated permanent lots, part through parking structures, and part through land acquisition and surface lot development. Section 5.3 addresses land acquisition proposals to meet property requirements for both new facilities and parking, with particular focus on the next ten years (Phases 1 and 2).

The Physical Development Program is designed to be updated on a periodic basis, to reflect changing facilities requirements, and priorities and timing.


Table A
NEW FACILITIES DEVELOPMENT
For planning purposes, the following table summarizes new permanent facilities assumed for the 15-year planning period, and their assumed sizes and phasing. Figure M indicates the locations assumed for the purpose of phasing land acquisition and parking development. This information is subject to periodic updating, based on the Capital Improvement Plan and other information as it comes available.


Figure Reference Facility Name Gross Square
Feet
Construction
Start(1)
Construction
Completion(1)

CURRENT FACILITIES PROJECTS(2)

1 Magnetic Resonance Imaging Facility 7,000 1 1
2 University Alumni/Foundation Building 1 1
3 Addition to Optical Sciences Building: Phase I 36,000 1 1
4 Center for Creative Photography 55,000 1 1
5 Agricultural Laboratory Building 110,000 1 1
6 Student Health Center Expansion 10,000 1 1
7 Life Sciences/Medical Sciences Building: Phase II 98,000 1 1
8 Computer Center Expansion 40,000 1 1
9 Life Science Building: Phase I 81,000 1 1
10 Centralized Laboratory Animal Resrouce Facility 34,590 1 1
11 Additions to Fine Arts Complex 140,000 1 1
12 Business & Public Administration Building 178,220 1 1
13 Chemistry-Biology Sciences Classroom & Laboratory Building 115,000 1 2
14 Student Recreation Facility 110,000 1 2
15 Utilities Expansion: Phase III 14,000 1 2
16 Mirror Polishing Facility 1 1

FUTURE FACILITIES PROJECTS (3)

17 Aerospace & Mechanical Engineering Building 118,000 1 2
18 Children's Research Center & Research Expansion 48,900 2 2
19 Library Expansion & Student Learning Center (Health Sciences) 72,000 2 2
20 Optical Sciences Expansion: Phase II 40,000 2 2
21 Steward Observatory/Astronomy Expansion: Phase II 37,000 2 2
22 Space Science Addition 45,000 2 2
23 Environmental-Natural Resources Building 220,000 2 2
24 Mathematics & Physics Building (4) 138,000 2 2
25 Heart Center (Health Sciences) 73,000 2 2
26 Super Computer Center (5) 57,000 2 2
27 Residence Life Facilities: Phase I 140,000 2 2
28 Utilities Expansion 14,000 2 2
29 Library Expansion 198,000 2 2
30 Systems Engineering Building 100,000 2 2
31 Administrative Services Building (6) 132,000 2 2
32 Art Museum Addition 86,000 2 2
33 Utilities Expansion 2 3
34 Arthritis Center 40,000 2 3

POSSIBLE FUTURE FACILITIES PROJECTS (7)

35 Social & Behavioral Sciences Building (8) 123,000 3 3
36 Continuing Education/Media & Instructional Services/University Press Building 235,000 3 3
37 Chemical Engineering Facilities 75,000 3 3
38 Family & Community Medicine/Other Health Professions/Speech and Hearing Center 255,000 3 3
39 Pharmacy Building Addition 48,000 3 3
40 Architecture Building Addition 47,000 3 3
41 Main Science, and Fine Arts Library Additions (9) 156,000 3 3
42 Life Sciences South Addition 60,000 3 3
43 Residence Life Facilities (10) 140,000 3 3
44 Computer Center Expansion 40,000 3 3
45 Hospital Wing/Clinics 125,000 3 3
46 Student Services Building (11) 190,000 3 3

NOTES

    1. Phase 1 5-Year Period 1986 through 1990
      Phase 2 10-Year Period 1991 through 1995
      Phase 3 15-Year Period 1996 through 2000

    2. Building design or programming underway or complete, Facility Site Analysis complete, or under construction.

    3. Most projects listed in Preliminary Future Capital Outlay Plan.

    4. Tentative location only; size and site subject to detailed planning studies. Alternate site in Southwest Sciences Area.

    5. Assumed sited north of Speedway Boulevard, as part of new engineering complex, and with room for future expansion. Alternate location next to existing Computer Center.

    6. This space requirement is assumed to be met through a combination of new construction and renovation of existing facilities into a single consolidated complex, in the vicinity of the existing Administration Building and/or the Mixed Use Area.

    7. These projects are not listed in the Preliminary Future Capital Outlay Plan, but represent future possibilities.

    8. Gross square feet and phasing per 1987 Capital Outlay Improvement Plan. This space requirement is assumed to be met through a combination of new construction and renovation of existing facilities in the central area of the Main Campus.

    9. Assumed breakdown: Science (15,000 GSF), Fine Arts (43,000 GSF); Main Library (50,000 GSF). Fine Arts may be included instead, or in part in Project 18.

    10. Based on 1987 Capital Outlay Improvement Plan. To house 750 to 1,000 students. Time and location may depend on implementation and financing mechanisms. Tentative facilities site not yet determined.

    11. Tentative site not yet identified.
5.3 LAND ACQUISITION PROGRAM
5.3a Policy Guidelines

The following proposals relate to and amend the Statement of Planning Objectives and Guidelines Applicable to Land Acquisition Within the University Planning Area, adopted by the Board of Regents on May 29, 1981, as amended on January 18, 1985. The guidelines are included in the Appendix.

  1. Retain the existing planning area boundary as delineated in 1981. The boundary will function as the limit of University development, protecting the neighborhoods and commercial areas outside the planning area from encroachment. The boundary would be reviewed at five year intervals in conjunction with the five-year review of the Comprehensive Campus Plan.

  2. Phase land acquisition based on the Comprehensive Campus Plan, specifically the Physical Development Program (Section 5.2). Amend the Statement of Planning Objectives and Guidelines Applicable to Land Acquisition Within the University Planning Area as presented in Appendix A to this document. The amendment redefines reserve districts as "owner-initiated purchase" zones.

    The Physical Development Program will be updated annually to reflect revisions and additions to the State-required Capital Improvement Plan, as described in Section 5.1. The Program includes locations and phasing of proposed and planned new facilities, which will be utilized in phasing land acquisition to meet the University's future property requirements.

  3. Cite the intended immediate use and future anticipated use for each property when submitting property acquisitions for approval by the Board of Regents. This recognizes that acquisition is linked to planned utilization (see above), and that the "multiple- generation-of-use" concept is no longer appropriate in some instances (see Section 2.1a).

  4. Retain the "grandfathering" provision of the Land Acquisition Guidelines. Under the "grandfathering" provision, all property owners who have continuously resided in the same residence within the University Planning Area prior to December, 1967, may remain in their present residence for as long as they "wish."

  5. Accommodate University-affiliated uses such as religious groups, fraternities and sororities, and National Optical Astronomy Observatories (NOAO) within the campus planning area. This accommodation may include disposal or trade of University property on a case-by-case basis in support of University-affiliated uses.

  6. Promote the timely disposition of University properties remaining outside the Planning area due to the 1981 boundary adjustment.

  7. Retain the Historical Society Museum and Mansfeld Junior High School. This may include the trade of University property to consolidate holdings respective to each institution.

    Possibly retain selected commercial uses within the campus planning area as shown in Figure B.

5.3b Additional Acquisition Proposals

The following are additional proposals in regard to the University's land acquisition for Phase 1 (1986-1990);

  1. Acquisition Rate and Focus

    Maintain the existing rate of land acquisition at the average of about 1 3/4 acres per year for the last six years, at a minimum, excluding city street abandonments. If at least two parking structures are not constructed, additional land for surface parking would also be needed.

  2. Acquisition Review Process

    Continue to develop and refine a coordinated property acquisition review process within Administrative Services. Utilize and established list of criteria in review and selection of properties for acquisition.

  3. Timely Purchasing

    Further explore options to facilitate timely approval of property purchases by the Board of Regents. The purpose of this effort would be to find ways for the University to act on offers for sale of high utility property within the "window of opportunity" presented by the seller, while maintaining proper review and procedures.

  4. Additional Acquisition Costs

    Review the impact of A.R.S. Sections 11-963 (moving expenses) and 11-964 (supplemental payment to property owners) on the University's property acquisition program. This includes acquisition costs and procedures.

  5. Speedway Improvement Project

    Actively coordinate right-of-way acquisition with the city of Tucson for the Speedway Boulevard Improvement Project. Under the Intergovernmental Agreement of September, 1984, the University agreed to provide the city, at no cost to the city, with all necessary right-of-way it currently owns to implement the Speedway widening and accompanying realignment of the Speedway/Cherry and Speedway/Mountain intersections. The city agreed to provide necessary right-of-way, including street vacations, to the University for implementation/expansion of parking facilities. The coordination of these IGA-mandated activities is proposed to also include possible University acquisition of excess right-of-way from the city in some locations.

  6. Historical Inventory

    Develop a program to inventory all buildings under University ownership in order to identify historical resources. This is proposed to include historical assessment or properties as they are acquired by the University.